Direct answer: 100 ft standard wood fence
How this fence calculator works
The calculator separates the fence into straight runs, gates, and corners. A gate is treated as a section break: the fence is divided into equal sections, and the gate posts are the section endpoints. This avoids adding the same gate post twice. A 90° corner adds one terminal post. If your gate positions are uneven or your layout has several short returns, treat the result as a material allowance and adjust the post count with your installer.
All dimensions are converted to feet and inches before calculation. The displayed waste buffer applies to pickets; concrete has a separate overage input. Results are rounded up to purchasable units.
Standard vertical vs. shadow box
| Style | Pickets (100 ft) | Rails | What changes |
|---|---|---|---|
| Standard vertical (1×) | 209 net / 230 with 10% | 3 per bay (typical) | Single face; one set of pickets. |
| Shadow box (2×) | 418 net / 460 with 10% | Enter 6 if rails on both faces | Two alternating picket layers; more wind pass-through. |
Shadow box is not simply a cosmetic upgrade. It roughly doubles the picket order and may require rails on both sides. Use the rails-per-bay input to match your framing plan; the calculator does not silently double rails for you. The 2× factor assumes standard alternating board-on-board construction; wider boards, overlap, or other gap patterns change the picket count.
Post footing, frost line, and concrete
Structural longevity depends on burial depth, drainage, and soil. A common rule is to bury one-third of the post length, then go deeper if the local frost line requires it. A 6 ft fence commonly uses an 8 ft post with 24–30 in below grade, but cold-climate projects may need 9–10 ft posts. The table below is a planning reference, not a substitute for local code.
| Fence height | Typical post | Mild frost burial | Deep frost burial | Rails / bay |
|---|---|---|---|---|
| 4 ft | 6 ft | 24 in | 36–42 in | 2 |
| 6 ft | 8 ft | 24–30 in | 36–48 in | 3 |
| 8 ft | 10–12 ft | 32–36 in | 42–48 in | 4 |
Add 4–6 in of crushed gravel at the bottom of each hole for drainage, then pour concrete to the fill depth. The calculator asks for concrete fill depth, not total hole depth. If you dig 30 in and add 6 in of gravel, enter 24 in. Call 811 before digging.
What the estimate includes — and what it does not
Included
- 4×4 posts, 2×4 rails, pickets, concrete bags, screws
- Material waste buffer and concrete overage
- Gate post allowance and one post per 90° corner
- Editable unit prices and a ±8–12% sensitivity band (not a quote)
Not included
- Labor, permits, sales tax, equipment rental
- Gate construction, hinges, latches, and gate frames
- Site survey, property pins, utility locates, engineering
- Frost-depth design, wind uplift, soil bearing, HOA approval
The cost range is a material-only planning band, not a contractor quote. Edit the unit prices to match your local store and re-run the calculator before ordering.
Frequently Asked Questions
How many pickets do I need for a 100 ft shadow box fence?
For a 100 ft shadow box fence with 5.5 in pickets and a 0.25 in gap, you need 418 net pickets — double the 209 used by a single-sided standard fence. With a 10% waste allowance, order 460 pickets.
How many bags of concrete do I need per fence post?
A 10 in diameter hole with a 30 in concrete fill holds about 1.36 ft³. At 0.60 ft³ per 80 lb bag, that is about 2.27 bags per post. For 14 posts with a 10% overage, order 35 bags. Enter the concrete fill depth, not the full hole depth, if you use a gravel base.
Should I subtract the buried post volume from the concrete estimate?
Leaving the displacement box unchecked is conservative and covers irregular or bell-shaped holes. Subtracting a 3.5 in × 3.5 in post removes about 0.21 ft³ per 30 in hole, which is roughly 15% of the concrete volume. Either way, round up to whole bags.
How deep should fence posts be buried?
A common rule of thumb is to bury one-third of the total post length. In cold climates, extend the concrete footing about 6 in below the local frost line. Frost depth, wind exposure, soil, and permits are controlled locally — verify with your building department.
Does the calculator include gates and corners?
Yes, as a conservative estimate. Each gate is treated as a section break with two gate posts, and each 90° corner adds one terminal post. Gate framing, hinges, latches, and gate construction are not included in the material quantities or cost.
Why does shadow box use twice as many pickets?
Shadow box, also called board-on-board, attaches pickets to both faces of the fence in an alternating pattern. It uses approximately two sets of pickets, so the material count is roughly double a single-sided fence. Some plans also use rails on both faces; increase rails per bay if that is your design.