GUIDE 03 / PRE-DIG CHECKS3 MIN READ
Before You Dig: A Fence Project Checklist
Most fence problems start before the first post goes in: an unmarked utility line, a fence over the property line, a missing permit, or water pooling in the holes. Run this checklist before you order materials — it takes less time than fixing any one of those problems.
- Call 811. Utility locates usually require a few business days, so call at least 48 hours ahead. Marked lines can change post positions; find out before the auger does.
- Check permits and HOA rules. Height, setback, and material rules vary by jurisdiction and by neighborhood. Front-yard limits are often lower than back-yard limits.
- Confirm property pins. A fence built over the line can become a dispute. Build 2–4 in inside your property line and keep the survey notes.
- Check the frost line and soil. Sandy or clay soils may need a different hole size. Thefrost-line guidehas a planning table for burial depth by zone.
- Plan drainage. A gravel base and a sloped concrete crown help keep posts dry. Do not trap water against the post.
- Keep the gate posts heavier. Gate weight and swing load are different from a line post. Size the gate posts for the gate, not for the run.
After the checks, run the numbers
Once the layout and local rules are clear, the material takeoff is mechanical. Use thewood fence calculator for posts, rails, pickets, and concrete, or themeasuring guidefirst if the yard has multiple runs, corners, or gates.